skip to content
The Boring PartsFederalLocal · USLocal · Canada
The Boring Parts
Table of Contents

The Federal Communications Commission has finalized a rule that changes how non-geostationary satellite networks share radio frequencies with geostationary satellites. Until now, operators of low-earth orbit satellite internet systems had to prove they would stay below strict power limits designed in the 1990s. The new rule replaces those outdated power caps with modern performance standards that account for current satellite technology.

Why it matters: This rule removes a regulatory bottleneck that has slowed the deployment of modern satellite internet constellations. By allowing operators to use current technology rather than adhering to 1990s power limits, the FCC expects to increase spectrum efficiency and encourage more competition in the broadband market. The practical effect is that satellite internet providers can operate with more flexibility, which may eventually translate to wider coverage and lower service costs for consumers.

Who it affects

  • Satellite internet providers operating non-geostationary (low-earth orbit) networks

This action is a final rule published by the Federal Communications Commission in the Federal Register (FCC 26-26); you should review the full order and its technical appendices before relying on the specific frequency limits or compliance timelines.

Agency: Federal Communications Commission
Source: Federal Register — read the official document

Related actions